FACILITIES
Our activity takes place in a total space of approximately 17,000 m², spread over two pavilions:
- Cutting and welding workshop: approx. 7,000 m², where steel plates for non-cast parts are processed and welding work is carried out. The stock of steel plates, with an average of 500 tons processed, comes from SSAB and is used in the manufacture of all our products except for the main parts of the Xcentric Ripper, which come from the foundry.
Office building, machining, stock, painting, and assembly: approx. 10,000 m², housing all offices, state-of-the-art machining equipment and turning centers, the finished parts stock area, the painting area, and the machine assembly area.